window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-178402571-1');

admin

/admin

About admin

This author has not yet filled in any details.
So far admin has created 50 blog entries.

The benefit in the lead oxide production thanks to the Lead Shaver

2024-03-18T16:05:18+01:00

The benefit in the lead oxide production thanks to the Lead Shaving System Thanks to the lead shaving system (LSS technology), today you can produce lead oxide without emissions and lead in the air. In the previous article we described all the 'economic and environmental' benefits. If you haven't read it, I recommend

The benefit in the lead oxide production thanks to the Lead Shaver2024-03-18T16:05:18+01:00

MOP30 Lead Oxide production in Spain

2024-03-15T16:20:29+01:00

MOP30 Lead Oxide production in Spain In 2023 we installed the third MOP oxide mill, in the Exide plant in Spain. The first CAM mill was installed in the 1999, until today where there are 3 CAM mills. Industrial and stationary batteries are produced in this plant. Here we have installed the new

MOP30 Lead Oxide production in Spain2024-03-15T16:20:29+01:00

MOP30 Lead Oxide production in Brasil

2024-03-15T09:40:30+01:00

MOP30 Lead Oxide production in Brasil In 2013 we installed the second MOP oxide mill, in the Moura plant in Brasil. The first CAM mill was installed in the 2011, until today where there are 2 CAM mills. In this fantastic factory, AGM and flooded acid batteries of the highest level are produced,

MOP30 Lead Oxide production in Brasil2024-03-15T09:40:30+01:00

MOP30 Lead Oxide production in Poland

2024-03-15T08:55:35+01:00

MOP30 Lead Oxide production in Poland In 2017 we installed the sixth MOP oxide mill, in the Exide plant in Poznan. The first CAM mill was installed in the 2000s, until today where there are 6 CAM mills. In this fantastic factory, AGM and flooded acid batteries of the highest level are produced,

MOP30 Lead Oxide production in Poland2024-03-15T08:55:35+01:00

MOP24 Lead Oxide production in Italy

2024-03-14T16:54:14+01:00

MOP24 Lead Oxide production in Italy In 2022 we installed the third MOP24 mill, in the Exide plant in Romano di Lombardia The first CAM mill was installed in 1995, until today where there are 3 CAM mills. In this fantastic plant, AGM and flooded batteries of the highest level are produced, one

MOP24 Lead Oxide production in Italy2024-03-14T16:54:14+01:00

MOP30 Lead Oxide production in Italy

2024-03-14T16:42:43+01:00

MOP30 Lead Oxide production in Italy In 2021 we installed the third MOP30 mill, in the FIAMM plant in Avezzano. The first CAM mill was installed in 2013, to date where there are 3 30 ton CAM mills. In this fantastic plant, millions of lead-acid batteries are produced per year, from stationary batteries

MOP30 Lead Oxide production in Italy2024-03-14T16:42:43+01:00

MOP30 Lead Oxide production in United States

2024-03-14T16:53:34+01:00

MOP30 Lead Oxide production in United States This installation will be carried out in 2024, in Salina, USA. In this plant there are already 4 MOP24 mills, installed in 1995. In 2019 we carried out an electronic and electrical revamping in these mills. To date they produce approximately 80 tons/day of lead oxide.

MOP30 Lead Oxide production in United States2024-03-14T16:53:34+01:00

MOP24 Lead Oxide production in Colombia

2024-03-14T15:58:27+01:00

MOP24 Lead Oxide production in Colombia This installation was carried out in the 2022, in Colombia, at Willard Baterias. Willard is one of the largest lead acid battery manufacturers in Central America. Here we have installed the new lead oxide production department, with a: MOP24 oxide mill  Lead Shaver (LSS Technology) lead oxide

MOP24 Lead Oxide production in Colombia2024-03-14T15:58:27+01:00

MOP14 Lead Oxide production in Germany

2024-03-18T15:29:34+01:00

MOP14 Lead Oxide production in Germany This installation was carried out in the summer of 2020, in Berlin, at BAE Batterien GmbH. This company is a historic manufacturer of lead batteries, stationary and solar batteries, born in 1899 in Berlin. Here we have installed the new lead oxide production department, with a: MOP14

MOP14 Lead Oxide production in Germany2024-03-18T15:29:34+01:00
EN
Open chat
Scan the code
Hello
Can we help you?
This website uses cookies and third party services. Ok