In 2013 we installed the second MOP oxide mill, in the Moura plant in Brasil.
The first CAM mill was installed in the 2011, until today where there are 2 CAM mills.
In this fantastic factory, AGM and flooded acid batteries of the highest level are produced, among the best in the world.
Here we have installed the new lead oxide production department, equipped with:
Would you like more information on CAM equipment?
Fill out the form below and you will be immediately contacted by our team to discuss and work together to achieve high-performance batteries: